The biggest challenge of this project was securing materials that would create the rural look the client was wanting to achieve, under the budget they had to spend.
The challenge on the installation was every line of the pool fence was a different slope and PH Fencing had to dodge power, water lines and trees. In addition to this, prior to install, new turf had been laid but not on the whole site, so PH Fencing also needed to make allowances for future fill and turf to be added.
Another challenge was delivering the fence while maintaining the legal requirements for pool fences. This required some redesign of the fence and working around the existing trees in their back yard.
PH Fencing sourced 100 x 100 Class One Ironbark Posts from Pilliga Natural Timbers and delivered them to the site. The posts were all champhered and tops trimmed. Black 1200mm flat top panels in 2400 and 3000mm lengths were sourced from Central West Gates and Fencing, Dubbo. Posts were prepped with Cabots New Timber Prep and cleaned and oiled prior to the panels being installed.