Bluewater Stainless were given an absolute challenge by their client for this project. They were required to fabricate and install this job, at the height of the COVID pandemic in 2020.
Not only that, but they had to deal with the sheer volume of the job, requiring material to be especially extruded due to profile specified, alongside handling complex curves in 2 planes.
Bluewater Stainless came out on top of this task, using aluminium and Hilti fixings to develop the job as per architects specifications to provide a unique look and privacy from different angles.
They created an intricate jig to enable them to fabricate this project and provide a compliant balustrade that met the design intent.